This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:tips:stok_ve_maliyet_sistemi [2012/05/04 04:43] Samba Admin |
en:tips:stok_ve_maliyet_sistemi [2012/09/07 09:30] (current) |
||
---|---|---|---|
Line 70: | Line 70: | ||
{{:en:tips:inv:11.jpg?600|}} | {{:en:tips:inv:11.jpg?600|}} | ||
- | Finally this is the cost report for the work period. | + | Finally this is the cost report for the work period. The cost of everything is $18. If you include multiple work periods in this report you'll see the average cost. |
+ | |||
+ | You can visit our forum for your questions about this topic. | ||
+ | |||
+ | http://forum2.sambapos.com/index.php/topic,526.0.html |