SambaPOS

Open Source Restaurant POS Software

User Tools

Site Tools


Writing /var/www/doc.sambapos.org/public_html/data/cache/3/3859376b5b9fbe802ff23f022880a662.metadata failed
en:tips:stok_ve_maliyet_sistemi
Writing /var/www/doc.sambapos.org/public_html/data/cache/2/29c6cf9e7378489c77b920bc1fd6b103.xhtml failed

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:tips:stok_ve_maliyet_sistemi [2012/05/04 04:45]
Samba Admin
en:tips:stok_ve_maliyet_sistemi [2012/09/07 09:30] (current)
Line 71: Line 71:
  
 Finally this is the cost report for the work period. The cost of everything is $18. If you include multiple work periods in this report you'll see the average cost. Finally this is the cost report for the work period. The cost of everything is $18. If you include multiple work periods in this report you'll see the average cost.
 +
 +You can visit our forum for your questions about this topic. ​
 +
 +http://​forum2.sambapos.com/​index.php/​topic,​526.0.html
en/tips/stok_ve_maliyet_sistemi.1336092337.txt.gz ยท Last modified: 2012/09/07 09:30 (external edit)